Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 457 decisions within 5 km, 5 exact-site or onsite candidate records, and 19 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
19 structured nearby appeal records.
19 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of Permission for Planning Ref. 15/403: the construction of an industrial unit, entrances, boundary walls/fencing, connections to public services including all associated site works
(A) partial change of use of an existing floor area from that of a distribution warehouse to a service area for vehicles/tyre sales (B) Minor elevational & internal changes including new boundary gates (C) New signage with all associated site works and existing connection to all public utility services
The change of use of part of an existing building, previously granted permission under Planning Reference 19-126 (Distribution Warehouse), to a commercial play centre, including all ancillary play rooms, café / coffee dock, reception area, sanitary facilities, offices and associated facilities, together with new signage, minor associated site works, and the utilisation of existing car parking facilities, and the existing connection to all public utility services
Partial change of use of an existing disused factory building to that of a distribution warehouse with all associated site works and existing connection to all public utility services
Demolition of rear boundary wall enclosing the yard at the back of factory no. 2 and demolish some small sheds within the yard and to construct a new raw materials storage facility to the rear of factory no. 2, also remove the cladding and windows on the front elevation of factory no. 2 and install new windows and render the front elevation of factory no. 2 to match the front elevation of factory no. 1
Altering building layout, elevations and roof, install a new carpark and canopy to cover proposed wheelchair accessible spaces, and connect to existing storm sewer for new car park area
The brief summarizes the pattern across all 457 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 197030The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief