Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,173 decisions within 5 km, 5 exact-site or onsite candidate records, and 124 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
124 structured nearby appeal records.
124 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CREATE A HARDSTANDING STORAGE AREA WITH PERIMETER FENCING AND ACCESS GATES. A NATURA IMPACT STATEMENT (NIS) HAS BEEN SUBMITTED WITH THIS APPLICATION.
Planning Permission for a revised industrial development previously granted permission under Planning Register No 16/226 and extended under Planning Register No 16/9226 to construct an 80 metre x 30 metre industrial unit for the purposes of steel manufacturing with associated welfare facilities, external carparking and associated site works at the IDA Industrial Estate, Tiernaboul, Killarney, Co. Kerry.
CONSTRUCT AN 80 METRE X 30 METRE INDUSTRIAL UNIT FOR PURPOSES OF STEEL MANUFACTURING WITH ASSOCIATED WELFARE FACILITIES, EXTERNAL CAR PARKING AND ANCILLARY SITE WORKS
Planning permission to construct a new employee car park with combined vehicular and pedestrian entrance, inclusive of all associated drainage, ancillary site works and landscaping all at the Ballyspillane Industrial Estate, Ballyspillane, Killarney, County Kerry.
ERECT 3,791.00 M2 OF PHOTOVOLTAIC PANELS ON THE ROOF OF TWO BUILDINGS OF OUR FACTORY, WITH ALL ASSOCIATED SITE WORKS
CONSTRUCT A SINGLE STOREY, ESB MV SUBSTATION AND CUSTOMER SWITCH ROOM, PER ESB SPECIFICATIONS, WITHIN ITS EXISTING SITE COMPLEX
The brief summarizes the pattern across all 1,173 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19756The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief