Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 203 decisions within 5 km, 2 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct a dormer dwelling, detached garage, with septic tank / percolation area, and all associated site works
To construct a two storey dwelling, detached garage, with septic tank/percolation area, and all associated site works
For development which will consist of: An extension to the existing Bio Solids De-watering Building for the installation of new equipment and material storage along with a new external silo and associated concrete bund: a new concrete yard to access the building extension and all associated effluent and storm drainage networks: new security fencing and sliding gate and modifications to the existing entrance: replacement of existing Dissolved Air Flotation (DAF) system with a new DAF System; landscaping and all associated site works. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. The application will be accompanied by a Natura Impact Statement (NIS).
For proposed new dwelling house, domestic garage, new site entrance, septic tank treatment system, percolation area and all associated site works
For permission for development at their Milk Processing Plant comprising: - A process building to accommodate 14 process tanks and associated equipment, associated plant and equipment rooms and roof mounted air handling equipment. - Links to the existing Whey Factory and Workshop. - Associated site works including earthworks, retaining wall, drainage and road diversions, pipe and service bridges and the removal of existing external process tanks. - Electrical plant rooms to be located on top of an existing factory building to replace an existing electrical room inside the building. The new process building will provide a controlled and hygienic environment for existing product storage. The new electrical plant rooms are required to relocate an existing internal electrical room which is substandard and no longer acceptable. The milk processing plant site holds on industrial emissions licence issued by the Environmental Protection Agency
For development. The proposed development will consist of: Construction of two anaerobic digesters, one equalization tank to include concrete base, earth embankment and associated works; construction of biogas storage dome with biogas flare, desulfurization unit; construction of membrane and control building with yard slab and link road; construction of ferric chloride storage tank; installation of a new pipeline with underground and overground sections for the purpose of conveying renewable biogas to the Glanbia facility east of the N77 road; realignment of the existing internal road to facilitate vehicle movements; drainage works and all associated site works including landscaping. The dismantling and removal of an existing disused sludge mixing tank; dismantling and removal of an existing biotower. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. A Natura Impact Statement (NIS) will accompany this application
The brief summarizes the pattern across all 203 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19793The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief