Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,127 decisions within 5 km, 4 exact-site or onsite candidate records, and 78 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
78 structured nearby appeal records.
78 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development which will consist of the construction of 8 no. 2 bedroom apartments, in two separate two storey blocks, including bicycle storage pods ancillary site works, and connection to public services
For the construction of 12 no. social housing units consisting of 2 blocks of 2 bedroom apartments with all associated ancillary site works and services
To RETAIN alterations carried out to the dwelling house design previously granted under planning permission reference P12-21062
For development which will consist of the refurbishment of Existing Block B to consist of training rooms and offices all on the first floor of existing Block B. The refurbishment will necessitate the installation of an external fire escape, the strengthening of the existing first floor and the provision of partitions
For development which will consist of the installation of photovoltaic panels ( area circa 184 sq.m ) on the roof of the existing building and all associated works
For development which will consist of the upgrade of existing training rooms, offices and other ancillary areas for use as an educational and training centre, there are changes to the back elevation to include new doors and windows
The brief summarizes the pattern across all 1,127 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19801The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.