Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 353 decisions within 5 km, 1 exact-site or onsite candidate record, and 29 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
29 structured nearby appeal records.
29 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To carry out works consisting of filling a depression on agricultural lands with inert material (top soil and sub soil) and restoring the lands to agricultural use on completion
For the following works: 1) The demolition and removal of existing dilapidated prefabricated buildings on site and the construction of a new replacement building for educational purposes consisting of classrooms, storage rooms, sanitary facilities, and staff areas; 2) The installation of a new static storage firefighting water tank; 3) The construction of a new manure storage pit; 4) The provision of new site drainage works including new attenuation area and all associated ancillary site services; 5) The provision of a temporary construction site entrance from the public road and a new temporary internal construction access roadway; 6) Public road widening works including the construction of a new pedestrian footpath linking the existing public footpath to the Equestrian College site entrance; and 7) all associated demolition, landscaping, and associated ancillary site works
FOR • Construction of a new two storey extension to the eastern side of the existing building which was granted permission under Planning Reference. No. 19/894. • Internal alterations and elevational modifications to the southern end of the existing main school building, including new window openings and the application of an external insulation system. • New car parking area and all associated site & ancillary works. The proposed development is in an area of archaeological potential
For alterations and a minor extension to the rear of the existing school building, demolition of an existing music room building & prefab classroom building, construction of a new single storey building to the side of the existing main building providing 6 No. prefab, replacement classrooms, along with all associated site & development works
For the development of a two storey extension to the rear of existing Primary Healthcare Centre (orginally granted under planning reference 18-107) with all associated site development and ancillary works
For material change of use of 99 sq.m at ground floor level of approved Primary Healthcare Centre (Planning Ref: 18-107) from private medical practice use to retail pharmacy use, with all associated works
The brief summarizes the pattern across all 353 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19875The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief