Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 588 decisions within 5 km, 3 exact-site or onsite candidate records, and 26 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
26 structured nearby appeal records.
26 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For the construction of a car park to rear of Kuehne Nagel premises to extend existing parking area & PERMISSION for the construction of over flow set-down & parking area for trucks including new entrance, gates and boundary fencing & all ancillary site works. PERMISSION is also sought for RETENTION PERMISSION for site clearance works including excavation & creation of hard stand areas & associated works
For the construction of a light industrial building consisting of open plan warehouse, offices, toilet facilities & canteen. Also For permission for external yard areas, loading docks, car parking, proposed boundary fencing and connection to public services & to utilise entrance and car park areas previously approved under planning application P19-965 including ancillary site works
For the construction of a Light Industrial Building consisting of Open Plan Warehouse, Offices, Toilet Facilities and Canteen and PERMISSION for external yard areas, loading docks, car parking, proposed boundary fencing and connection to public services and to utilise entrance and car park areas previously approved under Planning Application P19-965 including ancillary site works
For the change of use from retail warehousing to offices and a storage department/ logistics centre and all associated site works
For construction of an extension to side and rear of existing factory unit to be used as raw materials and finished product storage and PERMISSION to upgrade the facade of the existing building and install new signage including ancillary site works
Of a specialist grout rig testing structure comprising a steel frame surface-bolted to a concrete foundation slab, with rendered block work to the lower section, profiled metal cladding to the upper elevations, an openable single-skin roof, roller shutter and personnel access doors, external signage, and all associated site development works
The brief summarizes the pattern across all 588 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19965The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief