Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 317 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
RETAIN DWELLINGHOUSE AND GARAGE ON SITE TOGETHER WITH ALL ANCILLARY SITE WORKS
RETENTION OF EXISTING DWELLING HOUSE, GARAGE AND ANCILLARY WORKS INCLUDING SITE ENTRANCE ON REVISED SITE BOUNDARIES
ERECTION OF 21 NO. PV MODULES ON SOUTH EAST FACING SLOPE OF EXISITNG CANTEEN ROOF
REPLACEMENT OF THE EXISTING SEPTIC TANK WITH AN ONSITE WASTEWATER TREATMENT SYSTEM AND ALL ANCILLARY WORKS.
The development will consist of the partial demolition, extension and attic conversion of an existing single storey bungalow and all associated site works. Amendments will be made to the elevations of the existing building including increased ridge height, reconfiguration of the existing openings and the addition of new openings. The extension of the bungalow will result in an increased ground floor area of 82sqm.
Demolition of part of the existing woodwork/construction studies building and prefabricated classroom building to rear of existing school. Construction of a single-storey standalone extension on lands to the north-east, consisting of 2 mainstream classrooms, 3 SET rooms, 2 construction studies/woodwork rooms, storage areas and toilet facilities along with hard and soft landscaped areas, upgrading of foul connections and surface water system, connections to all services, construction of a temporary traffic meeting point setback on L55513 and a temporary site access road off L55513 on the north eastern boundary of site and all other associated site works
The brief summarizes the pattern across all 317 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19972The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief