Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 1,796 decisions within 5 km, 10 exact-site or onsite candidate records, and 133 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
133 structured nearby appeal records.
133 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the following: Change of use of existing building from guesthouse to six no. 1 bedroom apartments and two no. 2 bedroom apartments, eight apartments in total, including all necessary internal/external works and all site development works. Existing building has connections to public water and sewer. Note these buildings are listed as protected structures registered D293 & D294 in the current Development Plan *Significant Further Information submitted 12/11/20*
Permission for change of use from existing office use to residential use consisting of 3no. residential units. Works to include, alterations to windows opes to rear return ground & first floor, alterations to existing window ope at first floor level to rear of main building to accommodate new balcony, new flat roof at higher level to single storey rear return, new roof lights to rear pitch, alterations to internal layouts, repair and upgrade works throughout, the creation of the private open space terrace areas in existing rear yard and all associated site works to a two storey plus attic protected structure
Permission for development at a Protected Structure, Ref. D219), for the change of use from existing office use to residential use consisting of 4 no. residential units. Works to include alterations to window and door opes to rear return ground floor, new flat roof at higher level to single storey rear return, new rooflights to rear pitch, alterations to internal layouts, repair and upgrade works throughout and all associated site works to a two storey plus attic protected structure.
Permission for development will consist of the change of use from an existing ground floor office to a doctor's surgery and all associated site works.
Permission for the construction of an extension to the existing school to provide a new school building one to three stories in height, including reconfiguration and demolition works to some existing buildings, ancillary accommodation and all associated site development works including relocated car parking and new sports pitches on the site south of the main school site accessed via Seatown Place. The subject site contains five Protected Structures; D454, D291, D456, D455, D236 and is located within the Jocelyn Street/Seatown Place ACA **SFI received on 17.4.24**
Permission for development to consist of the conservation, extension and change of use of former St. Joseph's Female Orphanage & Industrial School (A protected Structure RPS D290) and St. Malachy's Convent (A protected structure RPS D292) to residential use, which is in an Architectural Conservation Area (ACA). The development will consist of: (i) The complete restoration and refurbishment of the two protected structures to the front of the site. (Please see newspaper notice for full description). (ii) The demolition of the existing gymnasium, classroom, laundry and workshop building to the rear of the property at Castle Street, including all associated lean to and flat roofed annexes, a covered link to the industrial school, a single storey twentieth century laundry annex and fire escape, along with the adjoining grotto and twentieth century greenhouse and the cataloguing, removal and appropriate historical archival of all redundant laundry equipment. (iii) The construction of a new 4 storey apartment building with a recessed fifth floor to the rear of the site facing onto Castle Street; comprising 1 no. one bed studio apartment, 9 no. one bedroom apartments, 15 no. two bedroom apartments and 2 no. three bedroom units or 27 units in total (iv) Along with all associated terraces, balconies, lifts, rooflights, solar panels, refuse stores, drainage and site works. (v) The landscaping of the existing yard to the rear of the building, hard standing and garden to accommodate 19 no. car parking and 58 bicycle spaces using the existing vehicular access onto Castle Street along with the restoration of the pedestrian access and the provision of new steel and glass vehicular gates. (vi) All ancillary development, site services, drainage and landscaping works. The completed development will provide for 58 apartments in both blocks, 31 apartments in the front block, 27 apartments in the rear block comprising, 4 no. 1 bed studio apartment, 25 no. 1 bedroom units, 26 no. 2 bedroom units and 3 number 3 bedroom units. A NIS has been prepared in respect of the proposed development and accompanies the planning application. **Sig FI received on 12.10.22**
The brief summarizes the pattern across all 1,796 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19984The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief