Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 674 decisions within 5 km, 3 exact-site or onsite candidate records, and 58 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
58 structured nearby appeal records.
58 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
4 NO. TWO STOREY TWO BED TOWN HOUSES TOGETHER WITH ALL ASSOCIATED DEMOLITIONS AND ALL ANCILLARY SITE WORKS, SERVICES, LANDSCAPING AND PARKING
Retention of house and ancillary site development works
CONSTRUCT DWELLING HOUSE AND ANCILLARY SITE WORKS
CHANGE OF USE FROM AN OFFICE TO A CHILDCARE FACILITY. MINOR INTERNAL ALTERATIONS TO PROVIDE 2 NO. TOILETS.
DEMOLISH EXISTING SINGLE STOREY SIDE EXTENSION AND FRONT PORCH TO DWELLING HOUSE AND CONSTRUCT A NEW SINGLE STOREY SIDE EXTENSION AND FRONT PORCH TOGETHER WITH ALL ASSOCIATED SITE WORKS AND CONNECTION TO EXISTING SERVICES
MODIFICATIONS TO THE EXISTING DWELLING, WHICH SHALL INCLUDE PERMISSION FOR DEMOLITION OF A SECTION OF THE EXISTING REAR FLAT ROOFED STRUCTURE, PERMISSION FOR THE ERECTION OF NEW STRUCTURE UPON THE DEMOLISHED GROUND FLOOR AREA AND NEW EXTENDED FLOOR AREA LOCATED TO THE REAR, PERMISSION ALSO FOR A NEW FIRST FLOOR LEVEL ONE BEDROOM ELEMENT LOCATED TO THE REAR OF THE PROPERTY AND TO INCLUDE ALL OTHER ANCILLARY SITE SERVICES AND DEVELOPMENT WORKS ASSOCIATED WITH THIS PERMISSION
The brief summarizes the pattern across all 674 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 201041The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief