Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 44 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCT A DWELLING HOUSE WITH TERTIARY TREATMENT SYSTEM AND A SHED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
Planning Permission for development consisting of construction of a new slatted shed and underground slurry storage tank along with all associated site works There will be one buildings and all effluent will be collected and stored in the proposed/existing slatted tanks. The slatted shed will be 7.067m in height and is going to be constructed in an existing farmyard our clients family have been farming in for years.
RETENTION OF EXISTING GARAGE, INCLUDING ALL OTHER ASSOCIATED WORKS/SERVICES
Development consisting of construction of a new slatted shed and underground slurry storage tanks along with all associated site works.. There will be one building constructed and all effluent will be collected and stored in the proposed/existing slatted tanks. The proposed slatted shed will be 8.544m in height and is to be constructed in an existing farmyard our clients family have been farming for years. There is no protected structures close to the site or watercourses.
CONSTRUCT SLATTED FARM BUILDING
CONSTRUCT DETACHED DWELLING HOUSE, TOGETHER WITH A CARPORT AND PROPOSED EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 44 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 201047The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief