Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 195 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCT A COMMERCIAL UNIT INCLUDING OFFICES AND STORAGE AREA, NEW SITE ENTRANCE, CONNECTION TO PUBLIC WATER MAIN AND FOUL SEWER AND ALL ASSOCIATED SITE WORKS
CONSTRUCT COMMERCIAL UNIT INCLUDING OFFICES AND STORAGE AREA, NEW SITE ENTRANCE, CONNECTION TO PUBLIC WATER MAIN AND FOUL SEWER AND ALL ASSOCIATED SITE WORKS
The development will consist of: The installation of ground mounted Photovoltaic Panels with a maximum output of 1000 kWp (Kilowatt peak) distributed over grassed areas on a site size of 1.70 Ha with all associated site works.
RETENTION PERMISSION FOR "CLICK AND COLLECT" SIGNAGE IN THE EXISTING TESCO CAR PARK, PERMISSION FOR CONSTRUCTION OF A SHELTERED CANOPY (C 50 SQM) IN THE EXISTING CAR PARK FOR THE PURPOSE OF PROVIDING 2 NO. DEDICATED "CLICK AND COLLECT" SPACES FRO THE EXISTING TESCO STORE, 2 NO. PEDESTRIAN CROSSINGS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
Construct a new stand alone gymnasium adjoining the existing sports fields and changing rooms along with connection to public services and all associated services
CONSTRUCTION OF A DWELLING HOUSE, SEWAGE TREATMENT UNIT AND PERCOLATION AREA TOGETHER WITH ALL NECESSARY SITE ANCILLARY WORKS
The brief summarizes the pattern across all 195 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20110The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief