Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 498 decisions within 5 km, 3 exact-site or onsite candidate records, and 35 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
35 structured nearby appeal records.
35 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works
The demolition of 2 no. small sheds, construction of a new single dwelling, renovation of existing stone barn as a separate store / treatment room, new entrance with gates, driveway, stone wall & trees at boundary, septic tank, wastewater treatment system, percolation area, soakaways, new connection to mains water and all associated site works
The construction of a dwelling extension, new septic tank and percolation area and all associated site works
1st floor as constructed(to be retained as storage space) and permission for the construction of a two storey extension to their dwelling, installation of wastewater treatment system and ancillary works
Dwelling extension and modifications to the existing dwelling, new site entrance, new wastewater treatment system and polishing filter and all associated site works
The demolition of two farm buildings, to construct a new farm machinery shed, a new farm storage shed and a new cattle shed with an underground slurry storage tank and also a new dungstead
The brief summarizes the pattern across all 498 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201106The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief