Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 197 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a dwelling, garage, site entrance, install on-site effluent treatment system including all associated site development works
(a) dwelling house as constructed (further from the south-eastern site boundary than was previously approved), (b) site boundaries as constructed (slightly altered from those that were previously approved), (c) site entrance as constructed (slightly altered from those which was previously approved), and all associated ancillary works
The construction of a new dwelling, septic tank, percolation area, entrance and all associated site works
Construction of a loose house with an effluent tank, an extension to the easyfeed unit incorporating a slatted tank and all ancillary site works
The following changes to the drawing submitted under planning ref. 77/12428: adjusted floor layout, elevations and roof shape of house extension; construction of a boiler shed attached to the rear of the house; construction of a detached oil tank shed at the rear of the house; construction of a detached garage and all ancillary site works
The demolition of derelict cottage and the construction of a replacement dwelling house, garage, site entrance and install on-site effluent treatment system
The brief summarizes the pattern across all 197 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201228The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief