Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
Doire Bhanbh ,Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Doire Bhanbh ,

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

29% of nearby decided applications were refused. The site check found 24 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.

Matched source
201236
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Confirmed coverage

Zoning and settlement layers were intersected with the selected site against the loaded source datasets.

2 matched

Rural-housing policy

Confirmed coverage

One current citation from the Galway County Council development plan, with section, page and source URL.

1 matched

Flood, heritage, ecology and archaeology

Partial coverage

3 of 4 layers are loaded for Galway County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.

4 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

2 structured nearby appeal records.

2 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Galway County Council development plan.

1 matched
24Nearby applications
1Site-linked candidates
29%Nearby refused
2Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

201236

Chun athruithe a dhéanamh agus chun síneadh a thógáil leis an Scoil Násiúnta i Doire Bhanbh, Camus. Spás urláir comhlán na n-oibreacha beartaithe: 150 msq.

Granted0.0 km17 June 2021
2360503

For the development consisting of refurbishment and upgrading works [including (where necessary) replacement of existing poles along the existing overhead electricity line, minor ground works e.g. replacement or installation of stays, and maintenance or improvement works]; and all associated ancillary works including the provision of temporary accessways. Replacement poles will be constructed at, or immediately adjacent to, the existing structures that they will replace. Replacement poles will have a maximum height of 12m above ground; and be similar in appearance to existing poles. Planning permission is sought for a 10 year period. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application

Granted1.2 km05 June 2024
23448

For the construction of an electrical transmission support long duration battery array. The array will consist of 44 containers each holding battery storage units up to 2MW for a maximum total of 88MW. The development will include a control building, ancillary infrastructure including security fencing, lighting, CCTV, internal access roads & drainage together with all associated services. The overall development site is 0.827ha. The application is accompanied by a Natura Impact Statement (NIS)

Granted2.5 km06 August 2024
2561709

Chun teach conaithe, garáiste/seid agus seirbhis searachais a thógáil

Granted3.2 km18 February 2026
2461454

Chun teach cónaithe, garáiste/seid agus seirbhis searachais a thógail. Spás urláir comhlán na n-oibreacha beartaithe: 195.90 sqm (H), 24 sqm (G)

Refused3.2 km17 December 2024
2560938

Teach conaithe, garáiste/seid agus seirbhis searachais a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 195.90 sqm(H), 24.00 sqm(G)

Refused3.2 km02 September 2025

The brief summarizes the pattern across all 24 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required