Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
27% of nearby decided applications were refused. The site check found 394 decisions within 5 km, 1 exact-site or onsite candidate record, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) Convert existing single storey agricultural building with loft over to 3 bedroom storey and a half living unit and domestic access. (2) Fit Oakstown waste water treatment system and percolation area. (3) Construct new agricultural entrance adjacent. With all associated works and services
For the extension to a yard and a Retention application for the existing yard and manufacturing buildings/plant and all associated ancillary facilities within an existing quarry complex
(A) Erection of single storey type house, (B) Garage/store for domestic use, (C) Installation of an Oakstown BAF wastewater treatment plant with polishing filter percolation area and (D) New vehicular recessed entrance and access driveway and all associated site works
(A) Erection of single storey type house, (B) Garage /store for domestic use, (C) Installation of an Oakstown BAF wastewater treatment plant with polishing filter percolation area and (D) upgrading of existing agricultural entrance to a new combined vehicular recessed entrance and access driveway and all associated site works
For a) a single storey bungalow, (b) installation of a secondary effluent treatment system and percolation area and (c) all associated site works. Revised by Significant Further Information which consists of: • The red line site boundary has been changed. • The single storey bungalow position has changed. • Proposed landscaping plans and specification has been added
(A) retention planning permission for the following: (B) Retention of house type B, dormer style house as constructed on site 2. Retention of house type C, 2 storey detached house as constructed on sites 3-5 inclusive and all associated site development works.
The brief summarizes the pattern across all 394 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201259The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief