Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 389 decisions within 5 km, 1 exact-site or onsite candidate record, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a single storey dwelling, detached garage, foul water to on site effluent treatment system and percolation area, surface water to soakaways, recessed vehicular entrance and all associated site works
Constructing two no. detached bungalows with detached garages, individual treatment system, and all associated ancillary site-works on vacant sites 1 & 4 as granted under planning permission 06/919
Retention and completion of a detached dormer bungalow granted under planning permission 06/919, treatment system and all ancillary site works on Site 5, and full planning permission for two No. detached dormer bungalows on sites 1 and 4 as granted under planning file 06/919, individual treatment systems and all ancillary site works at Sites 1 & 4 as per PL. Ref. 18/1005
And completion of a detached dormer bungalow granted under planning permission 06/919, treatment system and all ancillary site works on Site 5, and full planning permission for two No. detached dormer bungalows on sites 1 and 4 as granted under planning file 06/919, individual treatment systems and all ancillary site works
Of decommissioning of existing septic tank and replacement with new waste water treatment system, percolation area and all associated site works to serve existing dwelling
A two storey/single storey dwelling, on site effluent treatment system and percolation area, surface water to soak aways, accessed via an existing family laneway and all associated site works
The brief summarizes the pattern across all 389 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201276The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief