Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 263 decisions within 5 km, 3 exact-site or onsite candidate records, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of 48 no. dwellings comprising of 38 no. houses in 10 no. 2 storey terrace blocks and 10 no. self-contained apartments in 1 no. 2 storey block, new access roadway and shared public surface, connection to public services, surface water detention pond, car parking, roads, footpaths, pedestrian access, communal bin store, open space areas and ancillary site development works
Construction of 6 no. two storey, semi-detached dwellings, new access roadway, connection to public services, carparking, roads, footpaths, pedestrian access, open space areas and ancillary site development works
Change of previously approved western and southern boundaries from rendered blockwork wall to concrete post and concrete panel fence
The construction of a 2-storey extension to the side of the dwelling house including all associated site development works
Construction of a single storey extension to the side of existing dwelling house
Relocation of the existing Cahir-Tipperary 38 kV line
The brief summarizes the pattern across all 263 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201281The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief