Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 93 decisions within 5 km, 4 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Planning permission 201340 for an agricultural feedstock based 1MW Anaerobic Digestion (AD) biomethane facility producing renewable energy facility utilising 29,800 tonnes per annum of agriculture sourced feedstocks, the proposed development will occupy an area of 2.31 hectares and will include the following elements: 1 no. single storey reception building with welfare facilities, staff and visitor car-parking, 1 no. truck delivery and pickup hardstanding area, 1 no. site perimeter low level bund, 1 no. overground water storage tank, 2 no. 40ft storage containers, 1 no. 20ft storage container, 1 no. propane storage tank, 1 no. methane storage tank, 1 no. feedstock hopper/feeder, 1 no. wheel wash, 1 no. rainwater harvesting system, 1 no. underground rainwater storage tank, 1 no. weighbridge, 2 no. anaerobic digester tanks, 2 no. digestate storage tanks, 1 no. slurry storage tank, 4 no. feed-stock clamps, 1 no. biogas and biomethane flare, condensate trap and pump, 1 no. 500 kWCHP plant, 1 no. pump and control room container, 1 no. biogas cleaning and upgrading container, 1 no. biogas compression container, 2 no. water interceptor units, 1 no. surface water soak-away designed to BRE365, surface water and feedstock leachate management infrastructure, 1 no. 6 PE wastewater treatment system, 1 no. ESB substation, new entrance off L1071, external perimeter stockproof fencing and gates, landscaping and tree screening and associated site works
The construction and operation of an agricultural feedstock based 1MW Anaerobic Digestion (AD) biomethane facility producing renewable energy facility utilising 29,800 tonnes per annum of agriculture sourced feedstocks, the proposed development will occupy an area of 2.31 hectares (5.71 acres) and will include the following elements: 1 no. single storey reception building with welfare facilities, staff and visitor car-parking, 1 no. truck delivery and pickup hardstanding area, 1 no. site perimeter low level bund, 1 no. overground water storage tank, 2 no. 40ft storage containers, 1 no. 20ft storage container, 1 no. propane storage tank, 1 no. methane storage tank, 1 no. feedstock hopper/feeder, 1 no. wheel wash, 1 no. rainwater harvesting system, 1 no. underground rainwater storage tank, 1 no. weighbridge, 2 no. anaerobic digester tanks, 2 no. digestate storage tanks, 1 no. slurry storage tank, 4 no. feed-stock clamps, 1 no. biogas and biomethane flare, condensate trap and pump, 1 no. 500 kWCHP plant, 1 no. pump and control room container, 1 no. biogas cleaning and upgrading container, 1 no. biogas compression container, 2 no. water interceptor units, 1 no. surface water soak-away designed to BRE365, surface water and feedstock leachate management infrastructure, 1 no. 6 PE wastewater treatment system, 1 no. ESB substation, new entrance off L1071, external perimeter stockproof fencing and gates, landscaping and tree screening and associated site works
Construction of a grain storage shed and all ancillary site works thereto
Changes to previously granted house design, ref 21/299 (the proposed development concerns the Recorded Protected Structure S548)
Construction of an extension and minor modifications to provide connection and alter the internal layout of the existing dwelling, works will also include the construction of a garage, provision of a new wastewater treatment system and the demolition of an existing outbuilding/shed to allow the provision of a vehicular entrance to the site, including all associated siteworks (the proposed development concerns the Recorded Protected Structure S548)
Install onsite wastewater treatment system, and all associated site works (This development is within the curtilage of a protected structure S22)
The brief summarizes the pattern across all 93 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201340The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief