Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 156 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of a steeltech type garage and storage shed with associated site works
The construction of a two-storey dwelling, garage, wastewater treatment system and polishing filter, new entrance and all associated site works
Renovation and extension of the existing dwelling. The works include the demolition of previously constructed rear extension and part built walls to side and rear of the existing house. Construction of new side and rear extensions and front porch to the existing house. Permission is also being sought for the demolition of the existing detached garage and the construction of a replacement detached garage (for domestic use), decommissioning of the existing septic tank and installation of a new replacement wastewater treatment system and all associated site works
The following: erection of a 2 storey detached house, a single storey detached garage to rear, all boundary treatment, a splayed and recessed entrance gate and driveway, the provision of a septic tank and percolation area, a new connection to the public water supply and all associated site works on and under land
Construction of an external utility room/store attached to the rear of the house; construction of an extension to the side (east) of the original house; construction of a detached garage; and all ancillary site works
The conservation and repair of the single storey portion of the main house for use as a family kitchen and living room, the conservation and repair of the adjoining building for use as bedroom accommodation, to include 2 restrooms and a utility room and all associated site works on and under land, including a connection to the existing septic tank serving the main house (Ballywire House is a recorded protected structure)
The brief summarizes the pattern across all 156 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 201363The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief