Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 106 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Offaly County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Offaly County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Offaly County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedNo current-dated citation is loaded for Offaly County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
THE CONSTRUCTION OF A SINGLE STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A VECHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS
(I) SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING DWELLING HOUSE COMPRISING OF 13.5 SQ/M (II) SINGLE STOREY EXTENSION TO THE SIDE OF THE EXISTING DWELLING HOUSE COMPRISING OF 30.5 SQ/M (III) EXTERNAL SHED COMPRISING OF 70 SQ/M AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CROGHAN BIOMASS FACILITY, LOCATED WITHIN THE TOWNLANDS OF ESKER BEG AND DRUMCAW OR MOUNTLUCAS, CO. OFFALY AT GRID REFERENCE 651434, 727855 FOR THE STORAGE AND SEASONING OF BIOMASS LOGS FOLLOWED BY CHIPPING OF THE SEASONED LOGS ON A SITE AREA OF 5.6 HA AND FOR THE FOLLOWING WORKS: (1) EXISTING STRUCTURES COMPRISING (A) WEIGHBRIDGE (120 SQ.M) AND (B) WEIGHBRIDGE CONTROL STATION (40 SQ.M); (2) AN ENTRANCE OFF THE R402 WITH A WALL, RAILINGS AND GATES; (3) PAVED AREAS OF THE SITE INCLUDING INTERNAL ROADWAYS (380 M), YARD AREA (1.1 HA) AND HARDSTANDING AREA (1,865 SQ.M); (4) UNPAVED ACCESS TRACKS (1.4KM LONG); (5) A LINEAR LOG STORAGE AREA 1.8KM LONG, C.4M WIDE AND UP TO 4.1M HIGH, EQUATING TO 9,400 TONNES OF WET LOGS. PLANNING PERMSSION IS SOUGHT FOR STORAGE OF BIOMASS MATERIAL (10,000 TONNES PER ANNUM) WITHIN THE FACILITY SUBJECT TO RETENTION AND FOR ALTERATIONS TO IMPROVE THE EXISTING ACCESS OFF THE R402 TO INCLUDE ROAD MARKINGS. THE DEVELOPMENT WILL INCLUDE ALL ANCILLARY WORKS.
TWO BAYS OF AN EXISTING SLATTED SHED AND PERMISSION TO CONSTRUCT AN AGRICULTURAL SHED INCORPORATING AN AUTOMATED MILKING PARLOUR, CALVING AREA AND CATTLE CUBICLES INCLUDING AN UNDERGROUND SLURRY STORAGE TANK AND ASSOCIATED SITE WORKS
A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A SINGLE STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTEWATER TREATMENT SYSTEM AND A NEW SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 106 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20141The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief