Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 288 decisions within 5 km, 1 exact-site or onsite candidate record, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of Change of Use of an existing Authorised Treatment Facility for recovery of end of life vehicles to a Biomass Renewable Energy Processing facility consisting of the following: (a) proposed 2 bay shed attached to the north east of the existing shed to be used for the intake and drying process of Biomass; (b) The existing shed to be used for Biomass pellet production; (c) Proposed 2 bay storage shed attached to the south western elevation of the existing shed to be used for storage of finished pellet product; (d) The existing oil depollution shed to be used for the storage of Biomass; (e) The demolition and removal of the existing bunded oil area / shed, including all ancillary works as per document lodged to Leitrim County Council
1. Construct a two storey type domestic dwelling with a single storey to the rear 2. To construct a domestic garage 3. To construct a new site entrance 4. To construct a Waste Water Treatment System to current EPA Code of Practice and all ancillary works.
New dwelling house, part single storey, part two storey, a single domestic garage, widening of an existing entrance onto the public road, onsite waste water treatment system to comply with EPA code of practice, connection to services, landscaping works, and all associated works necessary to facilitate the development
Construct a dwelling house, domestic garage, new entrance onto public road, onsite wastewater treatment system with connections to services and associated site development works
Existing dwelling house within revised site boundaries from the previously granted.
Ground floor & first floor rear extensions to the existing dwelling, demolition of the front porch and any ancillary works necessary.
The brief summarizes the pattern across all 288 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20151The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.