Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 183 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Leitrim County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Leitrim County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Leitrim County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedNo current-dated citation is loaded for Leitrim County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To 1. To demolish an existing habitable dwelling 2. To construct a two storey type dwelling with a single storey to the rear 3. Construct a domestic garage 4. To construct a Waste Water Treatment System to current EPA Code of Practice and all ancillary works
(1) retain and complete hardcore area, (2) to retain domestic storage area attached to garage and (3) construct private machinery storage shed to include new entrance from public road and any alterations necessary to the existing site layout including all ancillary works necessary to complete the development in lieu of Permission to construct private machinery storage shed to include new entrance from public road and any alterations necessary to the existing site layout including all ancillary works necessary to complete the development
Carry out the following alterations to existing house. 1/ Extend existing front entrance porch on South East elevation and 2/ Extend existing utility room/bathroom on North East elevation
Existing dwelling house within revised site boundaries from the previously granted.
Of extension to the rear of the existing dwelling house with associated amended rear roof and all ancillary site works
Construct a bell mouth entrance onto public road to facilitate access to forestry plantation together with internal access road and turning head and all associated site works
The brief summarizes the pattern across all 183 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20162The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief