Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
0% of nearby decided applications were refused. The site check found 87 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For proposed construction of 2 no. bell mouth entrances with access road so as to facilitate access into existing forestry plantation for the removal of timber and all ancillary works
Main entrance scullery replacement with retention of new single storey entrance, retention of single storey dining area extension and study/home office
(1). construct a single story type domestic dwelling with living accommodation in roof space. (2). To construct a domestic garage. (3). To construct a new site entrance.(4). To construct a new waste water treatment system to current EPA code of practice, and all ancillary works.
Extend duration of planning permission P.16/103 for a period of 5 years
(a) Convert existing clubhouse attic space into multipurpose area with sensory room, toilets and stairs from first floor, (b) alterations to existing roof structure to incorporate dormer windows, roof lights and lift shaft projection (c) provide passenger lift to all levels and associated structure, (b) remove existing external fire escape and provide new 3 storey extension incorporating stair core on north elevation(d) internal alterations to plans and elevations of existing club house and associated site works at Carrigallen GAA Grounds, Calloughs Td, Carrigallen, Co Leitrim, H12D427.
Planning Permission for (a) fully serviced multipurpose building to facilitate indoor training with signage, (b) provide ground mounted solar panels (c) extend training field with perimeter fencing and revised flood lighting positions (d) detached modular coffee/tea shop (e) redesign entrance to existing clubhouse with new enlarged door/screen, exterior canopy and signage (f) provide score board to main field and electronic display messaging board towards road side (g) upgrade and extend existing walking track to perimeter of main pitch and extend to meet public footpath along roadside, (h) construct parking layout and outdoor gym area and all ancillary and associated site works
The brief summarizes the pattern across all 87 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20166The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief