Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 122 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the installation of approximately 4.6 kilometres (km) of underground cables within the Carlow County Council (CCC) boundary and approximately 2.0 km within the Laois County Council (LCC) boundary with a voltage of up to 38 kilovolts and associated works, including a new substation within LCC, for the connection of the consented Bilboa Wind Farm (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL 01.240245) to the national electricity grid; upgrading of an existing forestry track within CCC; construction of two new onsite access tracks within CCC; re-orientation and increasing in size of a crane hardstanding within CCC; and road strengthening and widening along an updated turbine delivery route, within LCC, pursuant to the consented Bilboa Wind Farm (Planning Register References; Carlow County Council 11/154; An Bord Pleanala PL 01.240245). The application is accompanied by a Planning Report, Environmental Impact Assessment Report and Natura Impact Statement.
Development will consist of the erection of five wind turbines with turbine blade diameter of 117m and overall height to tip of 136.5m. one permanent meteorlogical mast, access road and internal tracks, electricity sub-station, temporary construction compound, turbine laydown area, control building, 1 borrow pit, crane hardstanding, underground cabling, up to approximately 18 hectares of forestry felling and all associated site works, with an operation lifetime of 30 years. The application is accompanied by a Planning Report, Environmental Impact Assessment, and Natura Impact Statement.
Permission for development consisting of alterations to a previously permitted wind farm development (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL 01.240245) The proposed alteration will consist of increasing the maximum turbine blade diameter of the permitted turbines from 93m up to a maximum of 120m, while maintaining the overall tip height of the permitted development; increasing the size of crane hardstanding area at 4 turbines to 30m x 62.5m; felling of up to an additional 6.3 hectares of onsite forestry to accommodate the proposed increased turbine blade diameter in addition to the permitted felling; and an extension of the operational lifetime of the permitted wind farm development from 25 years to 30 years. The application is accompanied by a Planning Report, Environmental Impact Assessment Report and Natura Impact Statement.
To construct (i) Slatted shed with loose areas and crush (ii) Silage slab with earth bank walls (iii)storage shed and all associated site works at
For the demolition of an extension to side of existing dwelling, and the construction of a new extension to side of said dwelling. The demolition of domestic garage, the decommissioning of existing entrance and the construction of a proposed splayed entrance and all associated site development works
Permission for the demolition of an existing single storey extension to the rear elevation of existing dwelling, permission for the construction of a storey and a half type extension to the rear of existing dwelling, permission for the construction of a domestic shed/garage, and all associated site works
The brief summarizes the pattern across all 122 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20180The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief