Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 106 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To; I)construct a 6 bay double slatted sheep shed, 2) construct a four bay double lambing shed with adjoining dipping bond to service a mobile sheep handling unit, 3) demolish two existing sheds along with an already decommissioned septic tank and all ancillary site works at
Construct a two storey type domestic dwelling, domestic garage, new site access, construct a new waste water treatment system to current EPA code of practice and all ancillary works
(a) change the use of an existing derelict building into a commercial office/lab building, (b) renovate restore and extend the existing derelict building, (c) construct a new site entrance and to develop the site to accommodate for car parking, access and landscaping, (d) connect all public services and all ancillary works
The following works: (a) to retain, renovate and partly demolish and extend two number two beds and two number one bed residential units, the proposed works are single storey and two storey in height; (b) to create car-parking and all required ancillary services within the existing site area; (c) upgrade the existing site access on to Commons Lane; (d) upgrade all existing services on site an all ancillary works in lieu of Permission for the following works: (a) to retain, renovate and partly demolish and extend two number two beds and two number one beds residential units, the proposed works are single storey and two storey in height; (b) to create car-parking and all required ancillary services within the existing site area; (c) upgrade the existing site access on to Commons Lane; (d) upgrade all existing services on site an all ancillary works
Planning Permission to erect a 5m tall Digital Totem Sign and carry out all ancillary site works to facilitate this development.
1. Change the use of the licensed bar to an unlicensed café / open plan social space. 2. Change the use of a storage space to a commercial kitchen. 3. Change the location of 1 No. window and 1 No. door on the northwest elevation. 4. Demolish an existing rear porch.
The brief summarizes the pattern across all 106 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20229The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief