Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 62 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Proposed construction of a bungalow type dwelling house, detached garage, entrance, boundary fence/wall, septic tank with percolation area and ancillary site works
The proposed construction of a new two storey pitched roof detached dwelling house, new single storey mono-pitch detached garage, new vehicular entrance, new boundary treatment, permeable driveway, landscaping works, boring of private well, onsite wastewater treatment system to include percolation area, new solar photovoltaic panels, and all other associated ancillary site development works
To construct an extension to existing dwelling and all ancillary site works
Proposed construction of a two storey type dwelling house, detached garage, entrance, boundary fence/wall, septic tank and percolation area & all ancillary site works
The proposed replacement of an existing septic tank system with an onsite sewerage system with polishing filter in accordance with EPA Code of Practice 2021 and all ancillary works
Proposed construction of a single storey extension to service existing bungalow type dwelling house together with also seeking retention permission for an existing shed type structure used for domestic purposes and all ancillary works (Covid 19b)
The brief summarizes the pattern across all 62 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20249The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief