Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 881 decisions within 5 km, 2 exact-site or onsite candidate records, and 50 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
50 structured nearby appeal records.
50 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development consisting of the construction of 64 accomodation units in 5 seperate blocks with the following typology: 2 no. accomodation blocks with 8 no. Three bed units and 3 no. accommodation blocks with 16 no. Two bed units. Additional works to the site include landscaping, play areas, proposed 204 car parking spaces, boundary treatment, proposed new main entrance and all associated site works and services within the curtilage of a protected structure RPS Ref 12 SE and 13 SE/NIAH 32012037 as identified in the Sligo County Development Plan 2017-2023
For development consisting of the construction of 2 no. portocabins and internal alterations to the ground, first and second floor of the protected structures to include the dining area, communal kitchen, communal living areas and repairs to be made to the existing flat roofs and all associated site works and services for development at Globe House, which are protected structures RPS 12 and 13 as identified in the Sligo County Development Plan Record of Protected Structures 2017-2023
A perimeter boundary fence. The fence is required in the interests of public safety to prevent balls from being kicked over the boundary to the public road
Development consisting of the provision of a 150m2 single storey prefab building comprising 2 no. ASD classrooms and ancillary accommodation along with all associated site works and site services
The construction of a new extension to the front (west) of the existing school building on the site of the existing hockey field. The extension will be part single and part two storey and will be attached to the existing school via a single storey link. The additional accommodation will include a 2 class base special education needs unit, engineering room, textiles room, science laboratories, art/craft room, staff tuition rooms, staff office, sanitary accommodation, ancillary rooms, plant and stores. Minor works are proposed to the existing building to facilitate the new extension to include façade and layout changes in the vicinity of the link to the new extension. The works will include the provision of landscaped courtyard spaces adjoining the new extension, amendments to the existing road and landscape layouts to support the new extension, a new pedestrian site entrance adjacent the existing vehicular entrance, 6 no. additional carparking spaces and 30 no. covered bicycle parking spaces and all ancillary works
For development consisting of the a) The retention of single storey extensions to the rear circa 12.2 m2 and to the west circa 2.6m2, b) Retention of as built elevations and internal layouts c) Proposed alterations tothe South, East and West elevations and all associated site development works and services provision
The brief summarizes the pattern across all 881 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20445The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief