Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,303 decisions within 5 km, 3 exact-site or onsite candidate records, and 123 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Louth County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Louth County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Louth County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
123 structured nearby appeal records.
123 matchedNo current-dated citation is loaded for Louth County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for a change of use from commercial to residential use of the original residential area at first floor level
Retention permission for extension to existing creche.
Retention and Permission: Retention permission sought for driveway and existing single storey side and rear extensions, rear shed, front porch and permission for new dished kerb to public footpath
Permission to demolish two existing sheds to the rear of the existing dwelling and permission to construct a two storey extension to the rear, the conversion of the existing attic space to a non-habitable store room and to create a vehicular access and off-street parking to the front of the existing dwelling and to include internal alterations and all associated site works *Significant Further Information submitted 21/10/20*
Proposed development consisting of a new two storey 24 classroom school including all ancillary teacher and pupil facilities, delivered on a phased basis, will include the phased demolition/removal of the existing school building on the site including the relocation of 1 no. prefabricated building and eventual removal of all prefabricated buildings. Vehicular access to the site will be reconfigured with the existing entrance removed and a new pedestrian and vehicle entrance and exit formed off Donore Avenue providing access to a new drop off area the new entrance also accesses a new one-way coach and staff car park along the southern boundary exiting out onto Highfield Road. The development will include the provision of bicycle and scooter parking, hard and soft play areas, piped infrastructure and ducting, plant landscaping and boundary treatments, disabled car parking spaces, e-car charging points, ancillary pedestrian access ramps and stairs, signage, attenuation tank, changes in level and all associated site development and excavation works above and below ground
Retention of a single storey extension to the side and rear of a dwellinghouse
The brief summarizes the pattern across all 1,303 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20471The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief