Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 349 decisions within 5 km, 7 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of an onsite wastewater treatment system, consisting of wastewater pump station, over ground rising main, sludge tank, balance tank, aerobic digester, control room and all associated site works. Retention planning permission is sought for the erection of 2 No grain silos, 2 No gas silos and 4 No Multi-Purpose Vessels with all ancillary site works
For (a) the erection of 3 no. water tanks having maximum height of 12 meters above ground level. (b) the relocation of 2 no. existing grain silos and all associated site works
The installation of solar photovoltaic panels mounted to roof of existing portal frame building and all associated site works
(a) the change of use for part of existing portal frame building, from recreation centre to light industrial packaging / manufacturing area and visitor area. (b) External and internal alterations to include demolition of existing internal walls and alterations to roof structure and finishes. (c) The construction of an E.S.B. substation to include switch room and all ancillary development works
An extension to existing building consisting of extending existing locker room and new goods inwards/storage area at ground floor level and extending existing office area at first floor level, together with all associated site works.
The provision of internal first floor office space including the addition of first floor windows to the north and west elevations and all associated ancillary works
The brief summarizes the pattern across all 349 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2061The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief