Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 146 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Offaly County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Offaly County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Offaly County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedNo current-dated citation is loaded for Offaly County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
THE ERECTION OF A GUYED WIND MONITORING MAST, WITH INSTRUMENTS, UP TO 100M IN HEIGHT FOR A PERIOD OF 6 YEARS. THE PURPOSE OF THE PROPOSED MAST IS TO ASSESS THE SUITABILITY OF THE COMPANY'S ADJACENT LANDS FOR WIND FARM DEVELOPMENT
THE ERECTION OF A GUYED WIND MONITORING MAST, WITH INSTRUMENTS, UP TO 100M IN HEIGHT FOR A PERIOD OF SIX YEARS. THE PURPOSE OF THIS PROPOSED MAST IS TO ASSESS THE SUITABILITY OF THE COMPANY'S ADJACENT LANDS FOR WIND FARM DEVELOPMENT
Demolish existing dwelling and close existing entrance and full planning permission to construct a replacement dwelling house, to contour site, install a new septic tank percolation area, also a new well and to open a new entrance and all associated and necessary site works
Construct a two-storey and part single-storey extension and alterations to an existing, vacant two-storey dwelling house and the conversion of a single-storey outbuilding to a domestic garage and home office. The works will include the demolition of a lean-to shed to the rear of the house, a new waste water treatment system and all associated siteworks
DEVELOPMENT CONSISTING OF THE PROPOSED CONSTRUCTION OF A BUNGALOW TYPE DWELLING HOUSE, ENTRANCE, BOUNDARY WALL/FENCE, SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS
Extension of duration of planning reg: 16/240
The brief summarizes the pattern across all 146 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20647The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief