Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 162 decisions within 5 km, 1 exact-site or onsite candidate record, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of Permission for Planning Reference 15/167
The front boundary wall and detached garage as constructed together with all associated site works
Construction of a 30m multi user telecommunications support structure carrying antenna and dishes enclosed within a 2.4 metre high palisade fenced compound together with associated ground equipment cabinets, access track and associated site works
The demolition of an existing garage and erection of an extension to the dwelling together with changes to the internal layout along with ancillary site works
The change of use of a portion of the existing garage to playschool. Retention Permission of an existing garage extension and all ancillary site works
Developing a solar farm on a site located in the townland of Gibbonstown, Kilmallock, Co. Limerick. The proposed solar farm will comprise the construction and operation of solar PV arrays mounted on metal frames on an approx. 20 ha site inclusive of a single electrical control building up to 5 inverter units, a temporary construction area and ancillary facilities, drainage swales, boundary security fence with CCTV units, an access track, all associated works (inclusive of gross floor space of proposed works up to 146 sq. m) and habitat management and enhancement measures. The planning application is accompanied by an environmental report and stage 2 screening for appropriate assessment
The brief summarizes the pattern across all 162 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 207004The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief