Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 665 decisions within 5 km, 6 exact-site or onsite candidate records, and 28 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
28 structured nearby appeal records.
28 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCT A RELAXATION ROOM AT THE LOWER SPA-LEVEL ALONG THE RIVERBANK, CONSTRUCT A CONNECTING WALKWAY TO THE DECK GRANTED UNDER P19/209, INSTALL DOOR FROM SPA CORRIDOR TO WALKWAY, EXTEND DECK BY 47SQM FURTHER TO THAT GRANTED UNDER P19/209, MAKE CHANGES TO PLANNING PERMISSION P19/209 AS FOLLOWS: RELOCATE THERAPY POD AND INCREASE THE SIZE FROM 11.25SQM TO 15.30SQM, ADD A SECOND HOT TUB AND PLACE BOTH ON A RAISED DECK AREA, CONSTRUCT A TIMBER PAGODA OVER TUBS, PLACE ROCK ARMOUR UNDER THE DECK AND ALL ANCILLARY SITE WORKS
CONSTRUCTION OF AN ENTRANCE PORCH
We, The Ice House Limited, intend to apply to Mayo County Council for Planning Permission to install 49no. paired Solar Panel modules comprising of 191.37m2 of allocated roof area generating 39.69kWp on the flat roof of the extension located to the southwest of the Ice House and carry out all ancillary site works at The Ice House, Quignalecka Td., Ballina, Co. Mayo. F26 Y9E8, a Protected Structure.
LAY A 50MM DIAMETER WATERPIPE INSIDE A TRENCH IN THE RIVER BANK FOR 100M ALONG THE ROCK ARMOUR OF THE NORTHERN WING, CONSTRUCT 2 NO. DECK EXTENSIONS, PLACE A PRE-FAB THERAPY POD ON A NEW DECK AREA, PLACE A HOT TUB ON NEW DECK AREA. THE ICE HOUSE IS A PROTECTED STRUCTURE
DEMOLITION OF PART OF PREVIOUS EXTENSION TO REAR OF THE EXISTING DWELLING HOUSE, ALTERATIONS TO THE EXISTING DWELLING HOUSE WITH SUBSEQUENT CHANGES TO ALL ELEVATIONS, INCLUDING THE PROVISION OF A FIRST FLOOR LEVEL, DEMOLITION OF THE EXISTING SHEDS AND BOILER HOUSE AND CONSTRUCTION OF A NEW DETACHED SHED TOGETHER WITH ALL ASSOCIATED SITE WORKS
Retain minor alterations to front elevation of dwelling (replacement of bowwindows with flush windows) previously gratned under permisison P94/1125, retain basement granny flat and retain second entrance gate
The brief summarizes the pattern across all 665 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20702The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief