Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 441 decisions within 5 km, 1 exact-site or onsite candidate record, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For a renewable energy development on a 3.5 hectare site in the townland of Stonehall, Newmarket on Fergus, Co Clare. The proposed development will constitute the provision of the following: Construction of a Biomass processing and storage area utilising forestry products. Construction of a Gasification and Methanation Plant for the production of advanced biofuels. Construction of a Gasification and Combined Heat Power Plant for production of electricity and heating. Construction of a Battery Storage Facility (20MW). Construction of a Thermal Energy recovery and storage facility for district heating distribution. Construction of new on site 38kV substation. Creation of a new access road from the L-3169-0. All ancillary development including the provision of site office, car parking, internal access roads, perimeter landscaping, fencing, lighting, and on sire drainage. The Planning application is accompanied by a Natura Impact Statement.
To construct an extension to the rear of the existing dwelling house along with all associated site works and services
To construct an extension to existing dwelling to comprise of kitchen/dining room/livingroom, W.C. & utility. Application also for permission to demolish existing utility at rear of dwelling including all associated site development works
To construct a domestic garage to the rear of the existing dwelling including all associated site development works
For a proposed development at the site of the AAG Hangar Facility, which will consist of a single storey 50sqm shed within the Strategic Development Area of Shannon Airport.
For site boundary alterations and construction of a storage shed at the AAG Hangar Facility, Shannon Industrial Estate. The proposed development will involve: 1. Relocation of the adjoining Shannon Airport boundary fence to provide an additional 1,844 sqm of land to the North East of the AAG Facility and 2. Construction of a single storey, 42 sqm, storage shed within the Strategic Development Area of Shannon Airport
The brief summarizes the pattern across all 441 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20705The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief