Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 244 decisions within 5 km, 7 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works
A change of house design, change of garage design, change of site boundary and site layout plan from that granted in planning ref 20-759
Part demolition of existing single storey cottage and construction of a new single storey extension and re-modelling to the entire structure to include new pitched and flat roofs and new/revised window and door openings, connection to existing services on site, new hard and soft landscaping, amendments to the existing site entrance and all ancillary site works
Demolition of existing single storey cottage (and outbuildings) and construction of a new single and part two storey dwelling house on the site, new single storey garage, new hard and soft landscaping, provision of a new foul water treatment system and percolation area, amendments to the existing site entrance and all ancillary site works
Two extensions to the rear of house, also to retain a domestic garage on site
Change of use of domestic garage to childcare use and permission to retain modular building on the site and permission to construct an extension to the side & front of the existing Childcare building and permission to replace and relocate the existing septic tank with a site specific waste water treatment system to EPA Guidelines including all associated materials alterations and ancillary site works
The brief summarizes the pattern across all 244 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20759The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief