Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 175 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCT NEW DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA ALONG WITH ALL ANCILLARY SITE WORKS
Retention of developments on site namely: Construction of Domestic Garage and Domestic Fuel Store, together with all ancillary site works.
CONSTRUCTION OF A NEW DWELLING HOUSE ALONG WITH A SEPTIC TANK AND PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ANCILLARY SITE WORKS
CONSTRUCTION AND CONTINUOUS OPERATION OF AN AGRICULTURAL BIOGAS RENEWABLE ENERGY FACILITY CONSISTING OF; 2 NO. PRIMARY DIGESTER TANKS, 2 NO. POST DIGESTER TANKS WITH PUMPROOM, PASTEURISATION UNIT WITH AUXILIARY TANKS, EMERGENCY FLARE WITH BASE AND SECURITY FENCING, 2 NO. AGRICULTURAL SOLID FEEDERS WITH ASSOCIATED CONCRETE BASES, 2 NO. UNDERGROUND PRE-RECEPTION TANKS, 2 NO. COVERED AGRICULTURAL DIGESTATE STORAGE TANKS, GAS COMBINED HEAT & POWER (CHP) UNIT WITH CONCRETE BASE, SITE OFFICE/CONTROL BUILDING WITH ASSOCIATED STAFF CARPARKING AREA AND WASTEWATER TREATMENT SYSTEM AND PERCOLATING AREA, BIOGAS UPGRADING TREATMENT AND COMPRESSION SYSTEM, ELECTRIC TRANSFORMER AND SUB-STATION WITH SECURITY FENCE, AGRICULTURAL FEEDSTOCK STORAGE CLAMP BUILDING, NUTRIENT RECOVERY SYSTEM BUILDING WITH ANCILLARY TANKS AND EQUIPMENT, 4 NO. AMMONIUM SULPHATE SOLUTION (ASS) STORAGE TANKS WITH CONCRETE BASES, DIGESTATE DRYING AND PELLETISING BUILDING, PELLET STORAGE BUILDING, WEIGHBRIDGE, CONSTRUCT NEW ACCESS AND ENTRANCE IMPROVEMENT WORKS, SITE LIGHTING WITH SECURITY CAMERAS, SURFACE WATER DRAINAGE SYSTEM WITH STORAGE POND AND DISCHARGE SYSTEM, BOUNDARY EARTH BUNDED AREAS, LANDSCAPING AND BOUNDARY SECURITY FENDING AND ALL ANCILLARY WORKS LOCATED ON LANDS MEASURING 4.0 HECTARES. THIS APPLICATION IS ACCOMPANIED BY A NIS
Construction and continuous operation of an Agricultural Biogas Renewable Energy Facility consisting of; 2 no. primary digester tanks, 2 no. post digester tanks with pumproom, pasteurisation unit with auxiliary tanks, emergency flare with base and security fencing, 2 no. agricultural solid feeders with associated concrete bases, 2 no. underground pre-reception tanks, 2 no. covered agricultural digestate storage tanks, gas combined heat & power (CHP) unit with concrete base, site office/control building with associated staff car parking area and wastewater treatment system and percolation area, biogas upgrading treatment and compression system, electric transformer and sub-station with securty fence, agricultural feedstock storage clamp building, nutrient recovery system building with ancillary tanks and equipment, 4 no. Ammonium Sulphate Solution (ASS) storage tanks with concrete bases, digestate drying and pelletising building, pellet storage building, weighbridge, construct new access and entrance improvement works, site lighting with security cameras, surface water drainage system with storage pond and discharge system, boundary earth bunded areas, landscaping and boundary security fencing. All ancillary works located on lands measuring 4.0 hectares. The planning application is accompanied by a Natura Impact Statement (NIS)
Changes to the front porch design and construction from that previously granted permission and constructed under planning permission P05666 TOGETHER WITH ALL ANCILLARY SITE WORKS.
The brief summarizes the pattern across all 175 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20795The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.