Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 1,248 decisions within 5 km, 1 exact-site or onsite candidate record, and 78 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
78 structured nearby appeal records.
78 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For a new Advanced Building Solution consisting of an office and a light industrial/production space. Permission is also sought for vehicular and pedestrian entrance to site, signage, new timber post and rail site boundaries, car parking, cycle shelters, landscaping, a gas skid, underground storage tank, ESB substation, switch room, access road and all associated site works. The development has been the subject of a Screening for Appropriate Assessment in accordance with Article 6(3) of the EU Habitats Directive (Directive 92/43/EEC) and the Planning and Development Act 2000 as amended. The Screening for Appropriate Assessment will be submitted to the Planning Authority with the Planning Application.
EXTENSION OF DURATION OF 16/498 - expansion and extension of the existing unit, along with the provision of additional parking. Works to consist of 1. Alteration of existing building to include provision of new escape doors and louvres in south and east facades, new backlit signage, new single storey loading bay / workshop extension (80 sqm) to east elevation, provision of mezzanine first floor (1480 sqm) over entire existing waterhouse area to rear of building, and provision of new roof mounted plant. 2. Provision of new 3 storey extension (15,570 sqm) to north of existing unit consisting of production space, warehouse and canteen on ground floor, offices and gantry mounted plant space on first floor, office / laboratory space on second floor, roof-mounted fully enclosed plantrooms and stair access at roof level and backlit signage to north elevation. 3. Provision of a new 2 storey central utilities building (341 sqm) to the east of the existing building, incorporating a fenced in area for external flues at ground level and plant mounted of roof over ground. A new pipe will connect services to the existing building and proposed extension. 4. Alteration of existing site to include extension of existing internal site access road, new 1.5m high totem signage, provision of new bicycle shelter, provision of new landscaping and provision of 199 no. new parking spaces in addition to the 62 no. existing parking spaces maintained for a total of 261 no. parking spaces. All of the above to be done together with all associated site development works
Site alterations at facility to consist of: 1. Provision of 33 no. new car parking spaces. 2. Provision of 3 no. new flagpoles, with a maximum height of 7m, and signage. 3. Provision of 2.5m tall paladin security fence enclosing services compound. 4. Provision of vehicle barriers at the 2 no. existing site entrances. 5. External patio area and landscaping. Also applying for retention permission for 21 no. car parking spaces and re-location of the existing footpath. To be done together with all associated site development works
The proposed construction of a new first floor level within the existing double height production area to accommodate additional production area, laboratory, storage areas, offices and vertical circulation routes, Proposed minor alterations to the existing internal layouts, Proposed minor elevational changes inclusive of new louvres, Roller door and escape doors, Proposed Construction of a new ESB substation and MV switch building external to the existing building. These works are to include all associated plant & equipment, site works, site fencing, signage, alterations to internal road network and drainage
Extension to existing car park area to provide 44 no. new car parking spaces in addition to the 44 no. existing car parking spaces being maintained, for a total of 88 no. car parking spaces. Provision of vehicle barriers at the 2 no. existing site entrances. Surface water drainage for new parking spaces, alterations to existing site levels and ancillary site development works to accommodate the above works
For development of a Biopharmaceutical Development and Manufacturing Campus. The proposed development consists of a Biopharmaceutical Development and Manufacturing Campus. The development consists of all site buildings and infrastructure required to support the new campus; a) A 2-storey Biopharmaceutical Development. b) A 2-storey Laboratory, Administration and Canteen Building. c) A single storey Warehouse Building. d) A 2-storey Utility Building. e) The Utility building includes 3no. proposed Boiler Stacks. f) A single storey pedestrian link. g) A single storey materials link. h) Provision of new car parking spaces including approximately 379 car parking spaces. i) A single storey Security Building. j)A single storey Bicycle and Shower Facility Building. k) A single storey Firewater Pumphouse. l)A single storey Supply Water Pumphouse. m) The site infrastructure includes a bunded tank farm, pipe-bridges, sprinkler and water tanks, surface water harvest tank, docks and yards areas, including associated items of plant and equipment, electrical generators, a gas-reducing station, underground pumping facilities and internal roads and paths, fencing and site lighting, and the use if existing Horizon site entrance for heave goods vehicles. n)The development includes modifications to and the extension of the existing road network o) Proposed New Landscaping. p) Proposed New Signage. q) The works include temporary Contractor Compounds. r) New surface water management infrastructure. s) Modifications to the existing Development and Manufacturing Facility. t) All Associated Site Works. The application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act 2003) is required. A Natura Impact Statement (NIS) accompanies this application and will be available for inspection or purchase at the office of the Planning Authority. An Environmental Impact Assessment Report (EIAR) accompanies this planning application
The brief summarizes the pattern across all 1,248 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20797The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief