Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 280 decisions within 5 km, 3 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For [a] prefabricated steel frame structure to facilitate a gymnasium training area & to house generator to power floodlights & [b] upgrading to existing car parking area including public lighting and layout and all associated services. Gross floor space of proposed works: 88 msq
For a) All weather training pitch including associated drainage and piping and b) Replacement of existing floodlight arrangement upgraded to 6 No. 18m columns providing 350lux with associated cabling and main control panel and c) Replacement of existing barrier nets and support posts upgraded to galvanized steel posts and straining wires/nets and associated concrete pads and d) Provision of 2.4m height Secure Perimeter Fencing to all boundaries to include for 2 no. pedestrian gates and vehicular access gate to main entrance (previous planning permission ref. 05/2959). Previous planning reference No. 14/243
For the construction of 3 community tennis courts, fencing, lighting and all associated works.
For amendments to previously granted planning application (REF: 24/60466), for the construction of a residential development and all associated services. The amendments include the conversion of granted ground floor start-up commercial units to 7 x one-bed apartments in duplex block 1 and 2. The amendments include alterations to elevations and internal layouts, reorientation of both duplex blocks along with the addition of landscaping and alterations to public realm, connections to public watermain, surface water drainage, together with all associated site works and services
To erect an 18m high lattice telecommunications support structure together with antennas, dishes and associated equipment and remove the existing 15m high lattice structure
For the development consisting of the following: 1. Construction of a commercial building (3 Storey). 2. Construction of 2 no. (2 ½ storey) duplex buildings to provide for 7 no. ground floor commercial start up units and 8 no. 2 bed upper floor apartments. 3. Construction of 35 no. houses consisting of: a. 10 no. 4 bedroom 2 storey semi-detached houses, b. 1 no. 4 bedroom 2 ½ storey end of terrace house, c. 14 no. 3 bedroom 2 storey semi-detached houses, d. 2 no. 3 bedroom 2 storey end/mid terrace houses, e. 2 no. 2 bedroom 2 storey semi-detached houses, f. 6 no. 2 bedroom 2 storey terraced houses. 4. Provision of communal open space area with playground, private open space, public lighting, soft and hard landscaping and revised boundary treatments. 5. Car parking including dedicated EV charge spaces, ducting to all spaces for future electric charging points. 6. Provision of 2 no. vehicular entrances onto Pier Road. 7. Proposed pedestrian footpath along Pier Road. 8. Provision of bicycle and bin storage. 9. Provision for ESB Substation. 10. Connection to public sewer and provision for adjoining house to the north-east (Eircode H91DX8R) to connect to this sewer network, together with the decommissioning of the existing septic tank. 11. Connection to public watermain, surface water drainage, together with all associated site works and services. A Natura Impact Statement is submitted to the planning authority with this application. Gross floor space of proposed works: 4,028.00 sqm (house/s), 60 sqm (ESB substation), 728.80 sqm (apartment/s) & 823 sqm (comm/ind)
The brief summarizes the pattern across all 280 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20812The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief