Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 243 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a slatted agricultural shed. Gross floor space of proposed works: 512.5 msq
For a new dwelling house, domestic garage, on-site sewage treatment system, and all ancillary works. Gross floor space of proposed works: 240 sqm (house) & 45 sqm (garage)
For a new dwelling house, domestic garage, on-site sewage treatment system and all ancillary works
For the construction of a single dwelling house, domestic garage, proprietary effluent treatment system, percolation area and all associated site services. Gross floor area of proposed works: 268.00 sqm (dwelling house) and 60.00 sqm (garage)
For single storey ground floor extension & 3no. velux roof lights to the rear of dwelling
For (A) Construction of a building to the rear of the school to accommodate a multipurpose room / activity room and auxillary rooms (B) Installation of a temporary building (portacabin) until new building is constructed (C) All associated site development works. Gross floor space of proposed works: 113.4 sqm
The brief summarizes the pattern across all 243 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20857The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief