Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,339 decisions within 5 km, 2 exact-site or onsite candidate records, and 110 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
110 structured nearby appeal records.
110 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct a single storey vehicle storage building (including all associated site works) at the existing motorway maintenance depot, located
FOR CONSTRUCTION OF A SINGLE STOREY EXTENSION FOR OFFICE SPACE TO THE SOUTH SIDE OF EXISTING TWO STOREY OFFICE BUILDING, INCLUDING INSTALLATION OF ADDITIONAL WINDOWS IN BOTH THE SOUTH AND WEST FACING ELEVATIONS OF THE EXISTING OFFICE BUILDING, AND ALL ASSOCIATED SITE WORKS AT THE EXISTING MOTORWAY MAINTENANCE DEPOT
Of the following development: A. Retention Permission of the existing open storage area. B. Retention Permission of the existing boundary fence line together with all associated site works
For ten-year permission for development. The development will consist of the provision of a welfare unit on the site of Hebron Water Services Depot, including associated site works
To extend the existing open storage area together with all associated site works
The development will comprise of a hotel, leisure and conference complex, incorporating the refurbishment and change of use of Hebron House (a Protected Structure) as the hotel reception with meeting rooms and offices, the development of hotel parkland and the construction of an access road off the N10. The hotel extension off the refurbished two-storey over semi-basement Hebron House will provide a new two and three-storey hotel structure with 136 no. bedrooms, reception area, restaurant, bars, kitchen, staff room, stores, toilets, service areas, meeting rooms and conference centre and a lower ground floor level swimming pool, leisure centre, fitness suite, plant rooms and storage rooms. Within the grounds of the hotel, leisure and conference complex it is proposed to redevelop and landscape the existing walled garden and develop a landscaped parkland along the Pococke river, including footpaths and cycleways and a hotel car and bus park. A new access road is proposed from the N10 roundabout into Blanchfieldsland which will provide access to the proposed hotel complex and future developments on the Business Park zoned lands. Other works involve the demolition of existing outbuildings and sheds and the carrying out of all associated site development works, including a foul sewer pump station, storm drainage and attenuation, water services, ESB substation and lighting. A Natura Impact Statement will be submitted to the planning authority with the application.
The brief summarizes the pattern across all 1,339 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20867The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief