Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 126 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
CHANGE OF USE OF SCHOOL BUILDING TO DWELLINGHOUSE, ALTERATIONS TO FRONT AND REAR ELEVATIONS, ALTERATIONS TO REAR ROOF AND ALTERATIONS TO SITE ENTRANCE TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS.
Construction of a Bungalow Dwelling, Effluent Treatment System and together with site access & all associated site works.
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS
IMPORTATION OF INERT FILL SOILS MATERIAL FOR AGRICULTURAL IMPROVEMENT PURPOSES, INCLUDING ALL OTHER ANCILLARY SITE WORKS AND SERVICES
1. Retain existing 22.50sqm front Extension with stone façade finish. 2. Retain existing 16 sqm Sunroom to West Elevation 3. Retain existing 6.50 sqm Porch to Rear Elevation 4. Retain existing 87.50 sqm Attic Conversion including 2no. dormer windows to Front Elevation and 5no. velux windows to Rear Elevations. 5. Retain existing Property Entrance from Public Road. 6. Retain partly constructed 76.50 sqm Domestic Garage and complete with slate roof and roller shutter door to front elevation. 7. Retain partly constructed 26 sqm fuel store and complete with roller shutter door to front and corrugated lean two type roof. 8. Retain existing 83 sqm general storage shed with lean two type corrugated roof. 9. Retain all ancillary works to site. 10. Install 7 PE Mechanical Aeration Unit with distribution chamber with 5no. 9m long percolation trenches.
Construction of a slatted shed with underground slurry storage tank along with all associated site works
The brief summarizes the pattern across all 126 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20880The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief