Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 554 decisions within 5 km, 1 exact-site or onsite candidate record, and 40 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
40 structured nearby appeal records.
40 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A 10 year planning permission for the construction and operation of solar PV panels mounted on metal frames on a site extending to approximately 11.4ha and associated ancillary development including an electrical substation compound, control building (70sq.m), 4 no. inverter units, underground cable ducts, hardstanding area, boundary security fence, site entrance, access track, landscaping, CCTV and all associated enabling works. The proposed development also includes for a cable connection to the national grid. The planning application is accompanied by a Natura Impact Statement
The construction of a vehicular entrance, dwelling house, domestic garage, proprietary waste water treatment system with polishing filter together with all associated site works
Converted attic space to habitable space to existing dwelling house, detached garage and fuel storage shed, entrance wall and entrance including all ancillary site works
Construction of a new loose shed & for the extension of an existing slatted shed with slurry storage
The construction of a new, part single storey and part two storey split level dwelling house including entrance, proprietary treatment plant, soil polishing filter and all associated site works. Works also include for the demolition of two existing agricultural sheds
The construction of a new dwelling to replace an existing substandard dwelling, change of use of the existing substandard dwelling to out-house, new septic tank and percolation area, modifications to existing site entrance and all associated site works
The brief summarizes the pattern across all 554 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20940The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief