Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 1,247 decisions within 5 km, 8 exact-site or onsite candidate records, and 80 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
80 structured nearby appeal records.
80 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development at this site. The development will consist of the installation of a photovoltaic solar panel array approximately 2125m2 on the roof of existing buildings and all ancillary site works
For (a) Permission for development at this site, which will consist of the installation of a photovoltaic solar panel array approximately 1650m2 on the roof of existing buildings and all ancillary site works
For development at this site. The development will consist of the construction of a single storey store and welfare facilities building and all ancillary site works
The development will consist of the demolition of 3 single storey structures, construction of a new building extension which will consist of a warehouse, forklift charging room, welfare facilities and all ancillary site works.
For upgrade works to existing intake and processing facility. The development will consist of the demolition of a single storey intake structure and the removal of existing cladding on a single storey processing facility to facilitate the construction of a single storey building extension to the existing building which incorporates a new pig intake including modifications to the internal building layout and modifications to the external yard, boundary fence and all ancillary site works
For the following: Proposed two storey extension to the existing production facility at the front of site with all ancillary services and associated works along with a proposed water tank to the existing Car Park area
The brief summarizes the pattern across all 1,247 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211048The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief