Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
26% of nearby decided applications were refused. The site check found 529 decisions within 5 km, 10 exact-site or onsite candidate records, and 42 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched1 of 2 layers are loaded for Louth County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Louth County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Louth County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
42 structured nearby appeal records.
42 matchedNo current-dated citation is loaded for Louth County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Retention permission and permission for development that consists of retention permission for a new road entrance to the existing farmyard and also permission for the construction of a 4 bay shed to house horses and fodder and ancillary works (i.e. concrete yards, gates and boundaries) all for agricultural purposes only in extension of existing farmyard **Significant further information received on 21.7.22**
Permission for the construction of a new dormer-style dwelling, waste water treatment system and new vehicular access onto the L6308 and all associated siteworks
Permission for development will consist of the construction of a two-storey dwelling house, domestic garage, a proprietary waste water treatment system and all associated site works
Retention and Permission: Retention is sought for 1. existing single storey dwelling house and site layout as laid out and constructed. 2. Existing waste water treatment system servicing dwelling house as laid out and constructed. Full permission is sought for alteration works to existing shared vehicle access entrance and neighbouring roadside boundaries to provide upgraded sight visibility and all associated site development works
Retention permission and full permission for: 1) Retention permission of existing single storey dwelling house as laid out and constructed; 2) Permission for upgrading specification to roof covering & external wall finishes; 3) Installation of new Wastewater Treatment System, stormwater drainage system and all associated site development works
Permission for development that will consist of a new dwellinghouse, detached domestic garage, effluent treatment plant and percolation area and all associated site works
The brief summarizes the pattern across all 529 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 211050The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief