Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 147 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
REPLACING A 20M HIGH TELECOMMUNICATIONS MONOPOLE WITH A 24M HIGH TELECOMMUNICATIONS LATTICE STRUCTURE TOGETHER WITH ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT
THE DEVELOPMENT CONSISTS OF THE CONSTRUCTION OF A NEW DWELLING HOUSE (91m2) & DETACHED GARAGE (27m2), CONNECTIONS TO THE PUBLIC WATER & SEWER SYSTEMS TOGETHER WITH ALL ASSOCIATED ANCILLARY SITE WORKS.
The demolition of the existing two storey guest house building and outbuildings and the construction of a new 3 storey over basement conference facility including provision of a retail space and café facility, and including the provision of office space and conference accommodation and including all associated connections to services and site works and the provision of solar panels at roof level, situated at the corner of Main Street and Manor Corner, Knock, Co. Mayo, F12 KN88 by Human Life International Ireland.
Construct Hermitage on site with connection to public services together with all ancillary site works and services
CONSTRUCTION OF 2 NO. DWELLING HOUSES ALONG WITH ACCESS ROAD AND CONNECTION TO PUBLIC SERVICES ALONG WITH ALL ANCILLARY SITE WORKS
Permission for the installation of two temporary SEN classrooms with associated sensory room, toilet facilities, a secure store/office and all associated services.
The brief summarizes the pattern across all 147 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211057The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief