Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,685 decisions within 5 km, 1 exact-site or onsite candidate record, and 224 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
224 structured nearby appeal records.
224 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The use of the site for the storage of Titan Storage Containers for self storage uses, modular office (incorporating a toilet and kitchenette), sliding gate, signage and all ancillary site works
Construction of 1.no storage unit and 1 no. maintenance unit, vehicular accesses from an existing access road, parking, bin store, fences, signage, connections to existing services and all ancillary associated site works
The construction of a 24 metre-high free standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network
The construction of 3 warehouse blocks with 1 block subdivided into 2 warehouses, 1 block subdivided into 3 warehouses and 1 standalone warehouse, new entrances, blocking up of existing entrance, internal access roadway and car parking, connection to necessary services and all associated site works and; Retention permission for existing as-constructed freestanding scaffolding storage building which is to be relocated within the existing site
The construction of 9 no. dwelling houses, comprising 3 no. pairs of semi-detached 2storey houses (6 units) and 1 terrace of 3 no. 2storey houses (3 units), a new entrance from the public road, connections to the public sewer and all services, together with all associated site development works including internal estate road, car parking, footpaths, and all ancillary works
The change of use from Industrial warehousing to a gymnasium with all associated services, minor elevation changes to the existing building with the inclusion of proposed signage, construction of a new partial mezzanine floor at first floor level to serve as part of the gymnasium along with associated site works
The brief summarizes the pattern across all 2,685 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 211071The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief