Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 458 decisions within 5 km, 1 exact-site or onsite candidate record, and 28 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
28 structured nearby appeal records.
28 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the reconfiguration and refurbishment of the existing building on site to incorporate Cafe, Food Hall, Retail Hall and Kitchen and associated services (total area 675sq.m.). The construction of a new glazed access to outdoor area and a new entry hall extension for access from the car park to provide 4 no. designated spaces, 54no. car parking spaces and 2no. bus parking spaces. The construction of an external covered dining shelter structure, service yard area and associated hard and soft landscaping works, signage and ancillary site works. This planning application relates to a structure in a Special Area of Conservation and works within the curtilage of a Protected Structure
Of an enclosed Garden Centre comprising 2 repurposed shipping containers and clear covered plant area, along with benches and plant display tables.
Of existing canopy, food truck and coffee dock and signage for the same in front of the Jilly & Joe's Restaurant & Courtyard at the Meadows & Byrne Courtyard as well as external toilets in container at the back of Jilly & Joe's Restaurant & Courtyard near the chocolate shop at the Meadows & Byrne Courtyard
Of a food truck and associated seating area.
To carry out - A number of internal layout modifications within the existing building, - Construct a bar / restaurant area extension with associated external terrace areas, - Remove the various existing service yard structures to the north, - Construct a new service and keg room building, service yard wall, bin compound wall and universal access WC, - Refurbish and reuse the existing Keg Room building as a Tea / Coffee / Snack / Merchandise Outlet at ground and first floor level (public road level) and to construct a storage room extension at ground floor level and a new shopfront / entrance extension, balcony and stairs at first floor level (public road level) and a new pedestrian access and crossover from the public footpath on the old Limerick / Shannon Road (L3126). - Install new signage, new connections to existing site services and all associated site works
The development which will consist of the installation of a compact modular substation and ancillary site development works; to facilitate 4 no. shared electric vehicle charging units and 8 no. charging bays; and ancillary site works within a partially reconfigured area; and the installation of signage. This site is located within the curtilage of Bunratty Castle Hotel (Protected Structure, RPS No. 077).
The brief summarizes the pattern across all 458 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211141The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief