Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 578 decisions within 5 km, 2 exact-site or onsite candidate records, and 46 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
46 structured nearby appeal records.
46 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a dwelling, garage and effluent treatment system, all together with associated site works
Construction of a dwelling, garage and effluent treatment system, all together with associated site works
Construction of a storage/machinery shed and all associated site works
Extension and alterations to existing dwelling and garage. The works will include A. Construction of 12.6m2 single storey infill extension to connect existing 30m2 garage (now being converted) to existing 174m2 single storey dwelling. B. Conversion of existing garage to become part of the main dwelling which will contain a new bedroom and study and alterations and modifications to external elevations including 2 new rooflights. C. Minor alterations and modifications to existing dwelling layout and elevations and all associated site works
Importation of greenfield soil and stone for the improvement of land for agriculture, requiring the importation of 34654 cubic metres of inert greenfield soil and stone over a period of up to 3 years. The development will include resurfacing of the existing private access roadway, temporary wheelwash, temporary welfare cabin and all ancillary site works. The development will be subject to a waste management permit from Wicklow County Council
The construction of a new dwelling, treatment unit and soil polishing filter, new well, new entrance onto existing lane and associate works
The brief summarizes the pattern across all 578 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211219The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief