Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 169 decisions within 5 km, 1 exact-site or onsite candidate record, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) RETENTION OF THE VEHICLE ENTRANCE, SPLAYED ENTRANCE AND ACCESS (B) FULL PLANNING PERMISSION TO CONSTRUCT 6 NO. GLAMPING PODS ALONG WITH ASSOCIATED SITE SERVICES AND INFORMAL WALKING PATHS AND PERMISSION TO INSTALL AN ONSITE PROPRIETARY WASTEWATER TREATMENT SYSTEM TO SERVICE SAME (C)FULL PLANNING PERMISSION TO UPGRADE THE EXISTING AGRICULTURAL ACCESS ROAD AND CONSTRUCT A CAR PARKING AREA TO ACCOMMODATE 9 CAR SPACES ALONG WITH ANCILLARY SITE WORKS
CONSTRUCT A NEW DWELLING HOUSE AND DOMESTIC GARAGE SERVED BY MECHANICAL AERATION UNIT AND SAND POLISHING FILTER
Retention Permission to Retain (a) hardstanding areas, (b) Holding tanks, (c) 1 no. container, (d) 9 no. agricultural buildings, (e)Tree house and Full Planning Permission for the change of use from agricultural farm to a pumpkin farm event for 20 days (in any year) around the Halloween period including the change of use of (a) hardstanding areas as parking and circulation areas, (b) 1 no container, (c) 12 no. agricultural structures as temporary visitor amenities including entertainment, food kiosks, seating areas etc for the period of the pumpkin farm event and permission for the use of a toilet block and marquee structure for the period of the pumpkin farm event and all associated site services
CONSTRUCT A NEW DWELLING AND SEPARATE GARAGE, AND THE PROVISION OF A SEPTIC TANK AND PERCOLATION AREA, AND ALL ASSOCIATED SITE SERVICES
CONSTRUCT A NEW DWELLING HOUSE AND DOMESTIC GARAGE SERVED BY MECHANICAL AERATION UNIT AND SOIL POLISHING FILTER
The development will consist of the removal of an existing 18 metres monopole telecommunications antenna support structure and replacement with a new 24 metres monopole telecommunications antenna support structure carrying antennas, dishes, remote radio units (RRU's), together with cable ladder, GPS, gantry poles, concrete foundation, cabinet and all associated site development works to provide for high-speed wireless data and broadband services.
The brief summarizes the pattern across all 169 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211228The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief