Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 616 decisions within 5 km, 1 exact-site or onsite candidate record, and 35 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
35 structured nearby appeal records.
35 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCT DWELLING HOUSE AND TO CONSTRUCT DOMESTIC GARAGE, INSTALL EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA AND CARRY OUT ALL ASSOCIATED ANCILLARY SITE WORKS
CHANGE OF HOUSE TYPE GRANTED UNDER P11/167 & P11/1670 INCLUDING ALL OTHER ANCILLARY SITE WORK AND SERVICES
RETAIN EXISTING FIRST FLOOR LEVEL CONSISTING OF OFFICE AND ANCILLARY STAFF ROOMS. EXISTING EXTENSION LOCATED TO THE REAR OF THE EXISTING WORKSHOP MINOR CHANGES TO ELEVATIONS TO THAT GRANTED UNDER P99/2046
Construction of a new car display yard, 3 no. pre-fabricated office buildings (59.610m2 in total), together with new effluent treatment system to serve proposed development and adjacent motor dealership buildings and all ancillary site development works
Construction of proprietary effluent treatment system together with all associated site works
DEMOLITION OF EXISTING FLAT ROOF TOILET BLOCK (54.2SQM), CONSTRUCTION OF NEW EXTENSION TO ACCOMMODATE THE RELOCATION OF EXISTING MAINSTREAM CLASSROOM AND A NEW MAINSTREAM CLASSROOM WITH ANCILLARY ACCOMMODATIONS, RESOURCE ROOM, STORAGE, SANITARY AND STAFF ACCOMMODATION (226.6SQM), CARRYING OUT OF MINOR INTERNAL ALTERATIONS AND CHANGES TO EXISTING MAINSTREAM CLASSROOM WITH ANCILLARY ACCOMMODATIONS TO ACCOMMODATE AN ADDITIONAL ASD CLASSROOM, SAFE SPACE AND UNIVERSAL ACCESS WC WITH ANCILLARY ACCOMMODATION, (WORKS WILL INCLUDE ALTERATIONS TO EXISTING FLOOR PLANS AND ELEVATIONS), CONNECTIONS TO EXISTING SITE SERVICES AND EXTENSION TO/UPGRADE OF EXISTING FOUL WATER TREATMENT SYSTEM AND CARRYING OUT OF ALL ASSOCIATED ANCILLARY SITE WORKS
The brief summarizes the pattern across all 616 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211235The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief