Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 70 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development which will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works
Of(a) attic conversion with dormer and roof windows (b) domestic garage and boiler house (c) boundaries together with all associated site development works and services as constructed
For development which will consist of the construction of a new two storey dwelling, sewage treatment system, and private well with associated site works
To partially demolish the outbuildings, extend and renovate the existing dwelling, install a wastewater treatment system and for Retention permission for the mobile home on site for use as temporary accommodation during the construction works & all other associated site and ancillary works
To construct a dormer dwelling house, detached domestic garage, wastewater treatment system, polishing filter, entrance and all ancillary site works
To construct a dwelling house and garage with effluent treatment system, new entrance from public road and all associated site works
The brief summarizes the pattern across all 70 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211316The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief